| Owner |
THE REVENUE DEPARTMENT |
| |
|
| Main contractor |
Site Preparation Co.,Ltd. |
| |
|
| Problem |
The building had 5 floor levels. The
2nd and 3rd floors had to receive additional heavy
equipment. The existing structures of the 2nd floor
could not support this additional load. |
| |
|
| |
|
| |
|
| Our solutions |
Our challenge was to demolish the
existing structure and replaced with a new one
re-designed to support this additional load by
using WALL SAW. |